Tenatrak Software LLC · Leave-behind

How work gets done

  1. Tree. Site → area → line → asset. The map the floor already uses.
  2. Work on the asset. The job hangs on that node. The backlog is machines, not names.
  3. PM fires. Due work becomes a work order on the same asset. Not a second calendar.
  4. Tech closes on the floor. One job, checklist, scan, photo. Done means the board moved.

That is the product. Planner console for the owner. Technician PWA for the close. tenatrak.com